logo
YW DKE TRADING COMPANY
Home ProductsSMC Solenoid Valves

Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface

Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface

  • Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface
  • Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface
  • Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface
  • Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface
Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface
Product Details:
Brand Name: SMC
Certification: CE
Model Number: ISE30A-01-N-ML
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiation
Packaging Details: Carton /As The Clients Require
Delivery Time: 1-7Work Days After Payment
Payment Terms: T/T,Western Union,Paypal
Supply Ability: 5000 Pieces/1Month
Contact Now
Detailed Product Description
Part Number: ISE30A-01-N-ML Port Size: 0.25 In
Primary Type: Pressure Switch Series: ISE30 Series
Output Type: One-Touch Plumbing Type: ISE Positive Pressure
Highlight:

NPN pressure switch long lead

,

SMC ISE30A pressure switch

,

R1/8 interface pressure switch

Product Description:

Product Features

This device features a digital display that provides a clear and intuitive reading of pressure levels. Users can easily switch between multiple measurement units, enhancing versatility and convenience.

It offers high-precision detection and rapid response times, guaranteeing stable and reliable pressure monitoring. The system also ensures excellent repeatability for consistent performance.

The product is equipped with two-color LED indicators, allowing for immediate identification of normal or abnormal operating conditions. This feature facilitates quick troubleshooting directly at the installation site.

Users can freely set upper and lower pressure limits according to their requirements. Additionally, the device includes built-in NPN/PNP switching outputs for versatile control options.

Certain models come with advanced features such as parameter copying and IO-Link communication capabilities, making setup and network integration simpler and more efficient.

Designed to be compact and space-saving, the product supports flexible installation methods. It boasts a high protection rating, with oil resistance and anti-interference characteristics to ensure durable and stable operation in challenging environments.


Applications:

Typical Applications

Pneumatic systems commonly utilize these solutions for monitoring pressure levels and ensuring under-pressure protection, particularly in air compressors and air source treatment units. This helps maintain optimal performance and safety.

In automation equipment, these devices are essential for confirming operations and verifying pressure in components such as cylinders, grippers, and clamping mechanisms. This ensures accurate and reliable function during automated processes.

For pipeline monitoring, the technology serves to detect air leaks and provide alarms for filter blockages. This prevents operational disruptions and maintains the efficiency of the pneumatic systems.

Additionally, general equipment such as packaging machines, manipulators, and assembly lines benefit from air pressure control and safety protection. These measures help safeguard machinery and enhance overall production reliability.

Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface 0

Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface 1

Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface 2

Long Lead NPN Pressure Switch For Long-distance Installation Of Large Equipment SMC ISE30A-01-N-ML R1/8 Interface 3


Support and Services:

SMC provides comprehensive technical support and services for our Solenoid Valves to ensure optimal performance and customer satisfaction. Our support includes detailed product documentation, application guidance, and troubleshooting assistance. We offer expert advice on valve selection, installation, and maintenance to help you achieve efficient and reliable operation. Additionally, SMC provides training programs and technical seminars to keep your team updated on the latest technologies and best practices. For any technical inquiries, our dedicated support team is ready to assist you throughout the lifecycle of your solenoid valve products.


Packing and Shipping:

All SMC Solenoid Valves are carefully packaged to ensure maximum protection during transit. Each valve is individually sealed in anti-static packaging to prevent any damage from moisture or dust. The valves are then placed in sturdy, custom-designed boxes with adequate cushioning materials to absorb shocks and vibrations.

For bulk orders, the valves are organized in labeled cartons that are reinforced for enhanced durability. Each carton is clearly marked with product details and handling instructions to facilitate smooth logistics and inventory management.

Shipping is handled through reliable carriers with tracking options available, ensuring timely and safe delivery to the customer’s specified location. We also offer various shipping methods, including standard and expedited services, to meet different customer requirements.

Our packaging and shipping processes comply with international standards to guarantee that every SMC Solenoid Valve arrives in perfect working condition, ready for immediate installation and use.

Contact Details
YW DKE TRADING COMPANY

Contact Person: Sherlyn

Tel: +8613968387107

Send your inquiry directly to us
Other Products